... Great view of one of Europe’s most spectacular, scenic train routes... the Krauselklause Viaduct has an actual length of around 87 meters and stands at an impressive height of 36 meters....the double-story bridge features 6 upper arches resting atop 3 massive lower supporting arches... the whole railway line is only 41 kilometres long and overcomes a 460-meter elevation... engineer Karl Ritter von Ghega designed a route featuring long curves, tunnels and viaducts, so that the train could gain altitude gradually... instead of crossing the mountain as directly as possible, he had the track follow the natural contours of the landscape... as result, the railway line became almost twice as long between its two ends... there are 14 tunnels, 16 viaducts, and over 100 stone arch bridge... the first trains ran along this line in 1854 and this historic railway line is still in daily use with complete modern comfort... Thanks Christina!¯\_(ツ)_/¯
The Semmering Railway runs from Gloggnitz to Mürzzuschlag and was built between 1848 and 1854. It is estimated that around 20,000 people worked on the project.
This took place at a time when there were no modern excavators, lorries or tunnel-boring machines. Even dynamite had not yet been invented. Tunnels were largely driven through the rock using hand tools and gunpowder. Stone for the bridges and viaducts was quarried on site wherever possible.
It was also the world’s first true mountain railway and, in 1998, became the first railway ever to be inscribed on the UNESCO World Heritage List.
Stamp:
Northern Lapwing
(Issued 14-03-2026)
No comments:
Post a Comment